MOQ | 1 Piece/Pieces |
Processing | Fermenting Equipment | Condition | New |
Place of Origin | Shanghai, China | Brand Name | - |
Model Number | RLRCSS3/8*30 | Processing Types | Carbonated Beverage |
Voltage | - | Power(W) | - |
Dimension(L*W*H) | - | Weight | - |
Certification | ISO, CE / EU | is_customized | Yes |
key words | Homebrewing Racking Cane | Application | Home Brewer |
Function | Brewing Beer Brewing Equipent | Material | Stainless steel |
Feature | Eco-Friendly, Stocked | Type | Bar Accessories |
Bar Accessories Type | Racking Cane | After-sales Service Provided | No overseas service provided |
Warranty | - |
R&L homebrew pipe Filter screen Racking Cane Steel Mesh Filter 304 SS metal hose water fittings Brewery equipment Barware
R&L homebrew pipe Filter screen Racking Cane Steel Mesh Filter 304 SS metal hose water fittings Brewery equipment Barware
Product Details
Detailed Images
Services Detail
1.Reply inquiry in 24 hours.
2.Please kindly inform us which items you are interested &
the reasonable price will be provided you upon receipt of
your new inquiry asap.
3.Answer your question detailed
4.Solved the problem with you during using our
products
5. Samples will be offered to you for our future
cooperation.
6.OEM/ODM service are offerred.
FAQ
1.What equipments can we provide on
homebrew?
We can provide(but not limit to)beer/wine Brewing /
fermentation system,accessories,bar dispensers,kegs,drink
connectors,filters,thermometers,etc.
2. Which market used for?
Our brewing / bar equipments widely used in the market of
America,South America,Middle East,Europe,East south
asia,Afica etc.
3. When can I get the price?
We quote within 24 hours after we get your
inquiry.
4. How can I get a sample to check your
quality?
After price confirmation, you can require for samples to
check our quality.
5. How long can I expect to get the
sample?
After you pay the sample charges and send us confirmed
drawings, the sample will be ready for delivery in 3-10
working days.
6. What about the leading time for mass
production?
Honestly, it depends on the order quantity. Normally, 5
days to 7 days after your deposit if there is not other OEM
needed.
Contact Us
R&L International (Shanghai) Co., Ltd.
Mainpage:www.rlicl.com
Tel: ******** 8012
Fax: Ext. 8018
Rm. 401, Suite C, No. 100 Lane 2891 South
Qilianshan Rd., Shanghai, 200331, China
Attn:Emi
Rm.401, Suite C, No.100, Lane 2891,South Qi Lian Shan Rd,Shanghai, China