Item No.:
|
BL-080
|
Name:
|
Cohesive Bandage
|
Packing:
|
2.5cmx4.5M --24rolls/box,24boxes/ctn
5cmx4.5m---12rolls/box, 24boxes/ctn
7.5cmx4.5m--12rolls/box,16boxes/ctn
10cmx4.5m---12rolls/box, 12boxes/ctn
15cmx4.5m---12rolls/box, 8boxes/ctn
|
Material:
|
non-woven or cotton
|
Size:
|
2.5cmx4.5m, 5cmx4.5m, 7.5cmx4.5m, 10cmx4.5m, 15cmx4.5m
|
MOQ:
|
100000pcs
|
OEM:
|
it is ok
|
Certificate:
|
CE,ISO9001,ISO13485,FDA
|
DELIVER TIME
|
Within 35 days after deposit got and all designs
confirmed
|
H S CODE
|
30051090
|
Samples
|
Free samples can be provided by freight collect
|
Packaging
|
The printing machine which can print 6 panton colors
was brought from Japan
|




1 Q: Where is your factory ?
A:Our factory located in No.118 Yuegui South Road,City West New
District,321300 Yongkang City,Zhejiang
Province,China. Closest airport is Yiwu then Hangzhou then
Shanghai
2 Q: What are your main products?
A: Our main products are first aid bandages,wound
dressing,medical tape,cooling gel patch,nasal
strip,capsicum plaster,pain relieving patch,cold and hot
patch,face sticker,anti-mosquito patch,
hydrocolloid plaster,first aid kits and related first aid
disposable medical products.
3 Q: What is your production capability?
A: First aid bandages: 4million pcs per day.
Medical tapes 200,000 rolls per day.
Wound dressings 200,000 patches per day.
Cooling gel patches, anti-mosquito patch 200,000 patches per
day..
Nasal strips 200,000 strips per day.
Capsicum plasters,pain relieving pactch,cold and hot patch
200,000patches per day.
Hydrocolloid plaster 0.2million pcs per day.
First aid kits 5,000 kits per day.
4 Q:What is your MOQ for customerized packing goods?
A:First aid bandages MOQ: 1million pcs.
Medical tapes MOQ: 50000 rolls.
Wound dressings MOQ: 50000 patches.
Cooling gel patches, anti-mosquito patch MOQ:200,000
patches.
Nasal strips MOQ:200,000 strips.
Capsicum plasters,pain relieving patch,cold and hot patch MOQ:
200,000patches.
Hydrocolloid plaster MOQ: 0.5million pcs.
First aid kits MOQ: 25,000 kits
5 Q: How long is the delivery time of your goods? Where is the
loading port?
A: 30~35days after 30% T/T deposit received and all packing
details confirmed. Loading port: Ningbo or
Shanghai,others place in China according clients'
requirement.
6 Q:What is your payment term?
A:30% deposit by T/T in advance,70% balance before shipment
after passing quality inspection
7 Q:What is the H.S. Code for your products?
A:3005 1090 00.
8 Q:Which kinds of certificates do you have for your
products?
A: TUV-CE,US-FDA,TUV-ISO13485,TUV-ISO9001,GMP
9 Q:Do you have EU Representative?
A:Zogear Industries Co., Ltd 145-157 St John
Street,London,England,Ec1v 4pw
10 Q: How can we get a sample to check your quality?
A:After you pay the sample cost, the samples will be ready for
delivery within 7 days. The samples will be
sent to you by express and arrive within 3-4days. You can use
your own A/C or prepay us if no A/C by
express.